Mineral County Pioneer Council (MCPC) Transit Facility

Architect’s Rendering of Project

trim color changes due to available color options

ARCHITECT:
Slate Architecture
1470 North Roberts Street
Helena, MT 59601
(406) 457-0360

CIVIL ENGINEER:
IMEG
1817 South Ave West
Suite A
Missoula, MT 59801
(406) 721-0142

M.E.P. ENGINEER:
ACE, Inc.
3860 O’Leary Street
Suite B
Missoula, MT 59808
(406) 549-4160

STRUCTURAL ENGINEER:
IMEG
1143 Stoneridge Drive
Suite 2
Bozeman, MT 59718
(406) 600-5331

OUR TEAM OF SUBCONTRACTORS/VENDORS:
4-G Plumbing & Heating
406 Mudworx
Brown Painting
Builders First Source
Counter Solutions
Energy Partners Propane
Epic Steel
Haskins Excavation
Holman Engineers (Testing)
IMEG (Staking)
Jerome Well Drilling
Macon Supply
Marble Creek Construction (Finish Carpentry)
Montana Doorways Plus
Montana Plumbing Company
Northwest Interior Contracting
Pierce Flooring
Pump It Up Pump Service
Quality Seamless Gutters
Riska Insulation
Shadow Paving
Snow Mountain Electric
Wayne Dalton Overhead Doors
Western Drywall
Western Montana Roofing (Roofing & Siding)

STATE BUILDING INSPECTOR:
Shawn Rupp

DRONE FOOTAGE: Jon Schwarder

Status of Project - August 1, 2025: Northwest Interior Contracting installed the ceiling grid tiles; Energy Partners set the propane tank; Snow Mountain Electric doing rough-in and some finish work; Pump it Up Pump service installed the well pump and pressure tank; painting to be ready for finish carpentry next week. We’re moving along.


Status of Project - July 25, 2025: Riska Insulation completed the attic insulation; Hal Brown Painting is on schedule and doing a great job; 4G Plumbing and Heating is ahead of schedule and has the AC unit placed, the garage exhaust fan installed, the sensors in garage area installed; Haskins Excavation is in the process of backfilling and concrete prep around the building, has backfilled around the well, installed bollards, dug ditch and placed conduit for power and telephone, installed the catch basins at 4 corners of building for the downspouts, and built gravel pads for AC unit and propane tank. Northwest Energy installed the power line and meter. There is now power to the building; Marble Creek Construction installed all the doors, trim, and window frames on schedule. We have a great team and are grateful for our hardworking and dedicated subcontractors and vendors.

Status of Project - July 17, 2025: Western Montana Roofing completed the siding and roofing install and worked hard to stay on schedule. Riska Insulation, once again for us, completed the wall installation of the insulation. Western Drywall never disappoints and got the drywall completed within the timeframe. We are very grateful for our hardworking, loyal and dedicated subs, vendors, and the State inspection staff for their hard work and support.

Siding & Roofing

Drywall Nailing

Drywall

Insulation

Status of Project - July 3, 2025: Western Montana Roofing has stepped up to take over the siding installation portion of this project and began June 30, 2025. Thanks to Zach Westre and his hard working and skilled team, they should complete both the siding install AND roofing this week. Wall insulation to begin July 7th and drywall delivered July 9th with hanging to begin July 10th.

Status of Project - June 26, 2025: 4G Plumbing and Heating installed insulation as required on duct work; siding install delayed. Western Montana Roofing will now be doing siding installation along with the roofing and will begin Monday, June 30, 2025. We are still on task for completing the siding and roofing install per the May 17, 2025 construction schedule. Our thanks to those on the team who are keeping us on schedule. You are appreciated.

Status of Project - June 17, 2025: Siding material on job site; 4G 90% of rough-in complete but ready for siding install; site visit with owners, architect and engineers completed; inspections completed and ready for siding install; septic drain field installed and currently cordoned off to prevent construction activities from occurring on top.

Status of Project - June 7, 2025: Framing inspection and rough-in electrical in conditioned space inspection completed; Western Drywall installed drywall lid in conditioned space; Western Montana Roofing’s vendor produced roofing material on-site; Montana Plumbing completed rough-in plumbing; 4G in the process of completing rough-in mechanical; siding take-off finalized and Epic Steel has it in production and will be ready next week.

Status of Project - May 30, 2025

Status of Project - May 17, 2025

Status of Project - May 2, 2025

Drone Photos taken by Jon Schwarder April 27, 2025

Status of Project - April 26, 2025 - Framing, Trusses, Septic, Drain Field, Culvert Pipe

Status of Project Continued - April 20, 2025 - Photos of project throughout the week.

Status of Project - April 20, 2025 - Septic tank in place; sewer line from septic to building, two water hydrants, six catch basins, waterline and electrical conduit from well to building, conduit from building to septic for pump and alarm system installed. Framing began.

Drone Photos Taken April 13, 2025 - Photos courtesy of Jon Schwarder

Status of Project - April 12, 2025 Continued - Curbs Poured - Ready for backfill and framing

Status of Project - April 12, 2025 Continued - Foundation Poured

Status of Project - April 12, 2025 - Foundation Poured

Status of Project - April 5, 2025 - Foundation ready to pour April 7, 2025 at 7:30 am.

Status of Project - March 30, 2025 - Foundation prep in progress. Spread footings ready to pour 3/31/25 at noon.

Status of Project - December 27, 2024 - Well drilling complete

Status of Project - November 14, 2024

Status of Project - October 30, 2024

Drone footage taken October 28, 2024 - by Jon Schwarder

Status of Project - October 25, 2024

Status of Project - October 22, 2024

September 24, 2024 - Pre Construction Photos

Status of Project - October 17, 2024 - Mobilization and Pole for Temporary Power

Status of Project - October 18, 2024 - Tree Removal and Site Prep